Dwiki Subagdja Darmawan, Andhyka Tyaz Nugraha, Rizqi Wahyudi
The purpose of this study was to investigate whether the bullwhip effect (BE) occurs in CPO production at PTPN VII Unit Bekri, Lampung. Moreover, we make forecasting for the demand of CPO Products using the Double Moving Average (DMA) method and the Double Exponential Smoothing (DES) method as well as comparing the forecast result from both of these methods based on the lowest Mean Absolute Error (MSE) and Mean Absolute Percentage Error (MAPE) values. The monthly data on CPO production and sales for the period 2019 – 2021 is used for forecasting demand of CPO products. Our result shows that the initial BE value (1.08) is higher than a parameter value (1.04) and it indicates occurs BE on CPO production in PTPN VII Unit Bekri, Lampung. Furthermore, our findings also found that the value of MSE and MAPE from using the DMA method is lower than the DES method. Based on the results of this study, it is also expected to contribute references related to the application of forecasting methods in order to minimize BE. The DES method can be used to minimize BE that occurs in PTPN VII bekri units, based on the results of the analysis the DES method can reduce the BE value by 0.09. © 2022, Panji Sakti University. All rights reserved.
Industrial Engineering Study Program, Institut Teknologi Sumatera, Lampung, Indonesia
Research at a Glance
Register to unlockTopics & SDG Alignment
Register to unlockCollaboration
Register to unlockAuthor Profile (Selected)
Register to unlockReferences Overview
Register to unlockJournal & Source
Register to unlockMetadata & Integrity
Register to unlock